Facade Construction at Farhangian Residential Complex
Mar2019-Jan2020: Superintendent / Virtual Design Engineer (VDC)
Ziba Gostar Engineering co., Qazvin, Iran
Farhangian Residential Towers Façade Construction
- Developed a virtual design model and details that met the project’s prefabrication requirements for a 29-story tower adapted from laser-scanned data
- Generated, modified and optimized parts production data using Rhino, Grasshopper and Microsoft Excel for 2600 unique façade panels and 7800 structural parts
- Attended 4 meetings a month to resolve technical issues and conflicts, coordinate with team members, subcontractor and owner’s representatives
- Conducted project site visits daily to meet with construction staff, evaluate progress and complying with details and discuss execution issues
- Estimated quantities and cost of materials, equipment, and labor to make orders
- Continuously inspected the site for observation of safety protocols by staff and subcontractors
- Supervised 6 newly hired employees and interns while observing progress and delegating tasks